GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App by MyLoc8

GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App

$39.90
Sale price  $39.90 Regular price 
Skip to product information
GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App by MyLoc8
1/8

GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App

$39.90
Sale price  $39.90 Regular price 
Shipping calculated at checkout.
Description

Product Overview

The MyLoc8 GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App is a GPS Trackers product by MyLoc8. It features protect what matters most – track your car, truck, or.

Key Features

  • Protect What Matters Most – Track your car, truck, or fleet in real time with our GPS tracker for vehicles. Get instant alerts on movement or unauthorized access, giving you peace of mind 24/7
  • Stay in Control, Anywhere – Using our free iOS & Android app, view precise live locations anytime. The built-in SIM offers reliable 4G LTE tracking with flexible subscription plans
  • Discreet Yet Powerful – Our mini GPS tracker for vehicles is compact, waterproof (IP65), and easily hidden. Ideal as a car tracker device hidden from view for anti-theft protection
  • No Tools Needed – Quick setup. Attach the device using strong magnets—no wiring, no hassle. Great for fleet tracking, teen drivers, or company vehicles
  • Long-Lasting Peace of Mind – Track for up to 14 days on a single charge. This tracking device for cars ensures uninterrupted monitoring when it matters most

Why Choose the MyLoc8 GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App

The MyLoc8 GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App offers protect what matters most – track your car, and stay in control, anywhere – using our free. These features make the MyLoc8 GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App a strong option in the GPS Trackers category.

Best For

The MyLoc8 GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App is best suited for: Alert Notification, Geo-Fence, Location History, Real Time Tracking, Weather Resistant, fleet tracking.

Quick Summary

The MyLoc8 GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App is a GPS Trackers product by MyLoc8. Brand: MYLOC8. Special Feature: Alert Notification, Geo-Fence, Location History, Real Time Tracking, Weather Resistant. Connectivity Technology: 4G, Bluetooth, Wi-Fi. Supported Application: GPS (iOS, Android), Web Platform. Specific Uses For Product: Commercial GPS Tracking, Vehicle GPS Tracking, Worldwide GPS Tracking.

Product Specifications

Specification Details
Brand MYLOC8
Special Feature Alert Notification, Geo-Fence, Location History, Real Time Tracking, Weather Resistant
Connectivity Technology 4G, Bluetooth, Wi-Fi
Supported Application GPS (iOS, Android), Web Platform
Specific Uses For Product Commercial GPS Tracking, Vehicle GPS Tracking, Worldwide GPS Tracking
Care

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

Design

Our dedication to excellence extends beyond materials; it encompasses the artistry and craftsmanship illustrated in every piece we create.

You may also like

Frequently Asked Questions

Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
We do not currently offer free shipping. However, this may be added at some point. We apologize.
If your order has been shipped, we will add the tracking number to your order and notify you via the email address you entered when ordering.
For returns or exchanges, please contact us within 14 days of receiving the product, along with a receipt or screenshot of the purchase, and a photo of the product with the packaging or tag intact.